Pages

Friday, July 22, 2011

UP WE GO!

The showhome has a small second floor, which will house a media room (Man Cave for Brad!) and an office for Trisha....she works while he plays!


The floor trusses are in for the second floor and up go the first two courses of foam block.


The home entry begins to take shape
  

James Bussey, from Oasis Pools supervises as the formwork starts to go in for the pool. We are quite excited by this pool - it has some terrific features that we will point out as the construction progresses.


Our first look at the home and the pool from the water side! The elevated section on the right hand side is the Master Bedroom.